|
This type of permit is required for a single family dwelling, a duplex, or almost any structure associated with a home, such as: a carport, gazebo, RV cover, and a fence that is over 6 feet high. There are exemptions for permitting certain structures associated with a home, such as: a playhouse or shed which is detached from a house that is no larger than 120 square feet that is on a movable foundation (piers or skids), note that setback regulations according to Zoning must be in compliance. Also, cosmetic work does not need a permit.
A structure that is built such as a metal building with steel columns, beams, girts, and purlins must have a permit and a wind load certificate. A structure that is built with conventional studs and corner bracing or a pole barn type of structure does not normally require a wind load certification.
Residential Plan Review involves meeting with a building inspector from the Department and reviewing your proposed plans for construction. While not a requirement for permitting of all residential structures at this time, it is advisable that you get a plan review to insure your home is being built to proper code.
Anyone can voluntarily request a Residential Plan Review. The associated cost is $50 above normal permit fees. A Residential Plan Review is required for self-contractors and newly registered contractors.
The Planning, Zoning and Codes Department does not accept and issue building permits the same day. This process applies to: New Residential Construction, Residential Additions & Alterations, Swimming Pools and Sign Permits.
Please drop off your site plan (to scale on 8 1/2 x 11) and Residential Permit Application form to:
The Planning, Zoning, & Codes Department 220 West Willow Street, Building B
Lafayette, LA 70501
Office hours are between 7:00 am and 4:00 pm Monday through Friday
You will be notified within 3-5 working days as to when you can pick up your building permit. At the time of pick up, you must also have your REScheck approval form found at: http://www.energycodes.gov
This process will apply to lots in all approved subdivisions.
(Site plan MUST be in PDF format only)
|