Louisiana Avenue

Louisiana AvenueLouisiana Avenue Extension Phase II-D-1

  • Status: Under Construction
  • Limits: Maryview Farm Road to Butcher Switch Road
  • Total Cost: $7,500,000
  • Anticipated Completion: Early 2013
  • Scope of Work: Construction of a 4-lane concrete boulevard roadway with subsurface drainage, sidewalks and street lighting.

 

Louisiana Avenue Extension Phase II-D-2

  • Status: Engineering 80% Complete
  • Limits: Butcher Switch Road to Gloria Switch Road, with round-about at Gloria Switch Road
  • Total Cost: $5,600,000
  • Anticipated Start of Construction: Late 2013
  • Scope of Work: Construction of a 4-lane concrete boulevard roadway with subsurface drainage, sidewalks, street lights and a round-about at Gloria Switch Rd.

 

Approximate Cost of Completed Louisiana Avenue/I-10 Interchange (By LA-DOTD): $24,600,000

TOTAL FOR LOUISIANA AVENUE (LCG & STATE): $60,000,000 (Includes roadway from Willow St. to Gloria Switch Rd.)